Case Study

Mumbai Trans Harbour Link Project Package I, India

ESC provided full steel fabrication works for bridge girders, crossbeams, floor beams, and decking panels for a total length of over 960 meters in India

Temporary Access Bridge Project

The Mumbai Trans Harbour Link (MTHL), is an under-construction 21.8 km, freeway grade road bridge connecting the Indian city of Mumbai with Navi Mumbai, its satellite city. it would be the longest sea bridge in India. The sea link will contain a 6 lanes highway, which will be 27 meters in width, in addition to two emergency exit lanes, edge strip and crash barrier. 

Material Grade: ASTM A36/A36M or GB/T700 Q235B with yield strength min. 250 MPa

All raw materials are visually inspected, dimension checked, traceability checked, and review mill test certificate during the incoming process. Major components will be retested in 3rd party lab to ensure the mechanical properties and chemical compositions are acceptable.

ESC has assigned inspectors to monitor the entire ship loading process to ensure safe, secure, and sufficient protection to prevent damages during the shipping process.

production & Painting photos

loading, packing and stacking

Installation on site