CASE STUDY

TEMPORARY BRIDGE SPUDS, CEBU, PHILIPPINES

ESC Steel Structures fabricated high precise flange connected tubular section spuds for Cebu-Cordova Link Expressway Project, stay-cable bridge. ESC provided detailed design, 3D models and fabrication, trial assembly and delivery for 2 sets.

Full-assembly manufacturing at fabrication shop makes sure all the geometric dimensions and intersection cuttings and connections are accurate.

Fabricated Steel Bridge spud
Structural bridge construction
Bridge spud fabrication - spud pile engineering
Steel bridge construction - Spud applications

ESC Solution

  1. Detailing Design: ESC’s engineering team provided meticulous detailing design to ensure the spuds met the project’s specifications.

  2. 3D Models: Utilizing advanced technology, ESC created precise 3D models, offering a comprehensive visualization of the spuds’ structure.

  3. Fabrication Excellence: ESC’s state-of-the-art fabrication facilities ensured the production of spuds meeting the highest quality standards.

  4. Trial Assembly: Before delivery, each set underwent a thorough trial assembly, guaranteeing seamless integration into the bridge structure.

  5. Timely Delivery: ESC successfully delivered two sets of high-precision spuds, contributing to the project’s overall timeline.

ESC Steel Structures played a pivotal role in the success of the Cebu-Cordova Link Expressway Project, particularly in the fabrication of high-precision flange-connected tubular section spuds for the stay-cable bridge.